Design of Flyover Bridge

Ch. Manoghna, Shivangi Bharadwaj

Abstract


This venture manages the Design of a review separator in a crossing point. The site is at Mind space junction, which is confronting real movement issues because of the development. I have done a movement overview and composed all the basic parts for this review separator. The review separator contains of a deck section, longitudinal supports, cross braces, deck shaft, wharf and foundation. It is of 425m length around 0.5km. Auxiliary outline of one traverse was made for all the above parts Piece is figured by working anxiety technique according to the underwriting of IRC: 21-2000, Clause 304.2.1. Cantilever section is intended for greatest minute because of cantilever activity. Cross braces are planned for the most part for sturdiness to longitudinal supports. Elastomeric strengthened bearing plate is used. Longitudinal braces are figured by Courbon's technique. The deck bar is outlined as a cantilever on apier. The Pier is intended for the pivotal dead load and live load from the piece, braces, deck pillar. Establishment planned as balance for the protected load bearing in the dirt. Every one of the components are planned by utilizing M25 review cement and Fe415grade steel. Plans depend on working anxiety and Limit state strategy according to IRC: 21-2000 and IS: 456-2000.


Full Text:

PDF




Copyright (c) 2017 Edupedia Publications Pvt Ltd

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.

 

All published Articles are Open Access at  https://journals.pen2print.org/index.php/ijr/ 


Paper submission: ijr@pen2print.org