Analysis and execution of road work on NH-5

N. Abhilash, G. Chiranjeevi

Abstract


The initial installation cost of a flexible pavement is quite low which is why this type of pavement is more commonly seen universally. However, the flexible pavement requires maintenance and routine repairs every few years. Highway surveys involve the location of alignments and computation of volumes materials that must be added, removed, or moved. It initially requires a topographic survey of the site. For large projects, photographic method will be used to develop the base map. The base map is used by surveyors and other professional to create a base plan for the project. After the alignment has been established, the quantities of earth that must be added or removed are computed. The goal of most projects is to minimize the hauling distances of the earth. This is done using mass diagrams. Eventually surveyors layout the elevation and slope of the various sub-grades, base, and top coat materials. The end result is a smooth alignment with smooth transitions from straight to curved sections allowing for safe public transportation.

Full Text:

PDF




Copyright (c) 2015 N. Abhilash, G. Chiranjeevi

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.

 

All published Articles are Open Access at  https://journals.pen2print.org/index.php/ijr/ 


Paper submission: ijr@pen2print.org