Analysis and Design of a Steel Trussed Bridge of 93.20 M Span across Salt Creek in Kakinada

P. Madhu kumar, K.V. NARASIMHA RAO, DUMPA VENKATESWARLU

Abstract


This project is a real time project which is to be executed by the project authorities viz..Kakinada Municipal Corporation. The scope of study in this project involves Analysis and Design of 93.20 m span steel bridge structure using truss Type Bridge with built up sections. The sub structure involves a pile foundation with bored cast in situ piles connected with a rigid RCC pile cap nearer to the ground. The pile cap interns support a RCC bent type pier having a top trestle which supports the bridge bearing. The bridge bearing interns the supports are the steel truss. In the dissertation STAAD Pro software is used for the analysis and design of steel bridge structure. The foundation analysis and design is studied by using manual methods as for the Indian Standards (IS) and Indian Roads Congress (IRC) specifications and procedures.

Keywords


Analysis, Design of a Steel Trussed Bridge, 93.20 M, Salt Creek in Kakinada

Full Text:

PDF




Copyright (c) 2017 Edupedia Publications Pvt Ltd

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.

 

All published Articles are Open Access at  https://journals.pen2print.org/index.php/ijr/ 


Paper submission: ijr@pen2print.org