Performance Evaluating in the Light of Modern Manufacturing through the Integrating of the Financial Metrics and Non-Financial Metrics
Abstract
In power project are extremely capital intensive and before large resources are committed to scheme a detailed feasibility study needs to be prepared covering the need for the project, the demand projections, the alternatives of site location, the board parameters of the plant and equipment, the cost estimate and the viability of the scheme. The COMPANIES Ltd. One of the largest power sectors in the country has its objectives to manage the financial operation in accordance with sound commercial utility practices and to generate return as per government guidelines.
Full Text:
PDFCopyright (c) 2017 Edupedia Publications Pvt Ltd
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
All published Articles are Open Access at https://journals.pen2print.org/index.php/ijr/
Paper submission: ijr@pen2print.org