A Review on Waste Reduction through Value Stream Mapping Analysis

Praveen Saraswat, Manoj Kumar Sain, Deepak Kumar

Abstract


abstract

Keywords


Production time, Value stream mapping, Non value added time

Full Text:

PDF

References


Bo, M., & Mingyao, D. (2012). Research on the Lean Process Reengineering Based on Value Stream Mapping. Management Science and Engineering, 6(2), 103-106.

D. Rajenthira Kumar, P. R. (2010). Implementation of Lean Assembly Line: A Case Study. International Journal of Engineering.

D. Rajenthirakumar, R. G. (2011). Analyzing The Benefits of Lean Tools: A Consumer Durables Manufacturing Company Case Study. International Journal Of Engineering.






Copyright (c) 2014 Praveen Saraswat, Manoj Kumar Sain, Deepak Kumar

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.

 

All published Articles are Open Access at  https://journals.pen2print.org/index.php/ijr/ 


Paper submission: ijr@pen2print.org